2007 |
|
|
|
1 |
|
Implementation of Hazops Recommendation |
2007 |
MEDCO E&P
INDONESIA |
|
2 |
|
Sistem Kontrol untuk Konverter Kit PLTD |
2007 |
LPE - Kementerian ESDM |
|
3 |
|
HMI & PLC Reprogramming For Nilam Satellite 2, 4 & 5 |
2007 |
VICO INDONESIA |
|
4 |
|
Repairing: Indocement Upgrade HMI & PLC P8 |
2007 |
Indocement Tunggal Prakarsa Tbk. |
|
5 |
|
Upgrading Instrument Control & Safety Shutdown System si
Stasiun Lagan |
2007 |
MEDCO E&P INDONESIA |
|
6 |
|
Calibration Service Gas Compressor Instrument |
2007 |
MEDCO E&P INDONESIA |
|
|
|
2005 - 2006 |
|
|
|
1 |
|
Nilam Satellite Fire & Gas Retrofit |
2006 |
VICO INDONESIA |
|
2 |
|
Upgrade HMI Wunut Gas Plant |
2006 |
Lapindo Brantas Inc. |
|
3 |
|
Replacement MMI System at Cement Mill Plant 8B |
2006 |
Indocement Tunggal Prakarsa Tbk. |
|
4 |
|
Intrusion
Detection System, BP West Java Ltd |
2005 |
BP WEST JAVA LTD |
|
5 |
|
Pengadaan dan Pemasangan Instrument Control dan Safety
Shutdown System di Stasiun SOKA |
2005 |
MEDCO E&P INDONESIA |
|
6 |
|
Water Flood Project Air Serdang Block Station |
2005 |
PERTAMINA - TALISMAN (OK) Ltd |
|
7 |
|
Thermal Oxidizer Control & Interfacing to DCS-BCD Project,
Jabung - Jambi |
2005 |
PETROCHINA CHIYODA |
|
|
|
2003 - 2004 |
|
|
|
1 |
|
Control & Monitoring System Modification ATTAKA F/FS CLP
SYSTEM |
2004 |
UNOCAL INDONESIA CO. |
|
2 |
|
Provision of SCADA System for KE-40 Field Development |
2004 |
KODECO ENERGY LTD |
|
3 |
|
BBFE Vibration Transducer Monitoring & Control
System,Hangtuah & LGP Belida Platform |
2004 |
CONOCO PHILLIPS |
|
4 |
|
Monitoring System & Pneumatic Shutdown for Gas Compressor
SSE Blok, South Sumatera |
2004 |
MEDCO E&P INDONESIA |
|
5 |
|
Emergency Shutdown & Fire Control System Modification at
Mutiara Central Gas Plant |
2004 |
VICO INDONESIA |
|
6 |
|
Incubator,
Ballast & Heating and Control System |
2003 |
PT. BUMI TEKNOKULTURA UNGGUL |
|
7 |
|
Radio Installation at Indocement Cibinong |
2003 |
INDOCEMENT SCHNEIDER |
|
8 |
|
Chandra Asri PLC Modification
for Pneumatic Conveyor System & Pelleter System |
2003 |
CHANDRA ASRI |
|
9 |
|
Re-Wiring and Commissioningfor TMR shutdown system for Badak
Gas Plant-B |
2003 |
VICO INDONESIA |
|
10 |
|
Installation & Upgrading for Electrical System X-Ray
Offshore Platform |
2003 |
PERTAMINA DOH JBB |
|
|
|
2001 - 2002 |
|
|
|
1 |
|
PLC5 Base Control
Modification and Maintenance |
2002 |
PT. FREEPORT INDONESIA |
|
2 |
|
Gas Chromatograph Data Inserting
and Configuration |
2002 |
KODECO ENERGY LTD |
|
3 |
|
SCADA Development for Gas
Monitoring |
2002 |
KODECO ENERGY LTD |
|
4 |
|
PLC System Modification - Atlas Copco Compressor at PT. Pupuk Kaltim |
2002 |
ATLAS COPCO |
|
5 |
|
Safety Shutdown Panel & Fire
- Gas Control Panel ( Mutiara Field ) |
2001 |
VICO INDONESIA |
|
6 |
|
MP Fuel Gas Utilization (
Training & Commissioning ), Mutiara - Semberah |
2001 |
VICO INDONESIA |
|
7 |
|
Metering Control Panel Upgrading
- Santan Field |
2001 |
VICO INDONESIA |
|
8 |
|
Detroit Diesel Engine, Salawati Field |
2001 |
DEVON ENERGY LTD |
|
9 |
|
Fire and Gas Sensoring , Batara Gas Comp. Dev. |
2001 |
DEVON ENERGY LTD |
|
10 |
|
Motor Control Center (MCC) – Semoga Station, South Sumatera |
2001 |
EXSPAN |
|
11 |
|
Gas Lift Compressor Control
Monitoring - Gelam Field |
2001 |
GULF RESOURCES |
|
12 |
|
Retrofit
Control Panel for SOLAR Saturn Gas Turbine SKG Cilamaya Station |
2001 |
PERTAMINA DOH JBB |
|
13 |
|
Field Instrument Hook - Up, Mandala Gas Project |
2001 |
TALISMAN (OK) |
|
14 |
|
Pamaguan Heatless Dryer Control
Panel |
2001 |
VICO INDONESIA |
|
|
|
|
|
|
|
|
|
1999 - 2000 |
|
|
|
1 |
|
Remote & Local Control Panel
for Metering Skid |
2000 |
IKL for NORTH OIL CO, IRAQ |
|
2 |
|
Hazops Study - Mandala Gas Project |
2000 |
TALISMAN (OK) |
|
3 |
|
Alarm System ( Annunciator
System ) for Solar Saturn Turbine |
2000 |
DEVON TUBAN |
|
4 |
|
Automation System for Oil
Blending Machine |
2000 |
CASTROL INDONESIA |
|
5 |
|
Panel Mate/MMI Replacement |
2000 |
GOODYEAR INDONESIA |
|
6 |
|
GPF Machine Upgrading - Relay to
PLC System |
2000 |
GOODYEAR INDONESIA |
|
7 |
|
U2 Machine Upgrading - Relay to
PLC |
2000 |
GOODYEAR INDONESIA |
|
8 |
|
Gas Dryer Control Panel, Pamaguan Field |
2000 |
VICO INDONESIA |
|
9 |
|
Safety Shutdown Panel & Fire
- Gas Control Panel, Pamaguan Compressor Project |
1999 |
VICO INDONESIA |
|
10 |
|
Remote Monitoring System (
Telemetry System ), Semberah S13 - S14 Field |
1999 |
VICO INDONESIA |
|
|
|
|
|
|
|
|
|
1997 - 1998 |
|
|
|
1 |
|
Telemetry System for Train H
42" Gas Supply Pipeline |
1998 |
IKPT For BADAK NGL |
|
2 |
|
Control System for Raw Water
Clarification, Palembang - South Sumatra |
1998 |
WIKA For PERTAMINA UP III PLAJU |
|
3 |
|
SCADA System - Water Treatment
Plant, Engineering Design - Kuala Kencana - Papua |
1998 |
PT. FREEPORT INDONESIA |
|
4 |
|
SCADA & DMS Development
Phase 1, Surabaya - East Java |
1997 |
UPDS - PLN JATIM |
|
5 |
|
Greenhouse - Total Automation, Lembang - West Java |
1997 |
SEKAR G. LEMBANG |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|